Here's progress at end of day 1. The sink and shower are gone. And the back door that leads to the family room has been switched around to open out. That will eventually be a small closet.
On Day 2 the contractors built the new shower walls and put in the shower pan. You can see the line in the ceiling where the old shower wall was. The new shower is almost twice as big!:
Day 3, the contractor built out the closet that is to the left of the shower. It opens from the other room. The hole that you see on that small wall is where the medicine cabinet will be recessed. Also, the corner shower seat was installed.
Day 4 he laid the floor tile:
It's looking like the bathroom remodel is going to take around 2 weeks instead of the initial 1 week that we were hoping for. There's still a lot more tile work left to do and then all the fixtures have to be installed. I've been in Boston this week, but I'm heading back tomorrow.